View
Discussions Replied To (24) | Replies | Latest Activity |
---|---|---|
"Let the wood dry out until it reaches equilibrium moisture content before gluing. Ma…"Robert Bander replied Mar 19, 2010 to hot iron vs flowing steam for bending side |
13 |
Apr 26, 2010 Reply by Donald A. Fortune |
"My only concern is that I'll need to remove wood from inside and bottom of the gouge…"Robert Bander replied Mar 19, 2010 to Top repair after bridge removal |
12 |
Mar 26, 2010 Reply by Mark Dobbins |
"I was also thinking along those lines. I was thinking to sand no greater than 400 to…"Robert Bander replied Mar 19, 2010 to Top repair after bridge removal |
12 |
Mar 26, 2010 Reply by Mark Dobbins |
"The area is completely covered by the bridge when attached. I'll get a photo up late…"Robert Bander replied Mar 19, 2010 to Top repair after bridge removal |
12 |
Mar 26, 2010 Reply by Mark Dobbins |
© 2025 Created by Frank Ford.
Powered by