Hi, I have a situation where someone needs a guitar bridge repaired fairly quickly. I should be ready to adhere the bridge tomorrow (Wednesday) with hot hide glue. The guitar will then need to be slotted/drilled and all of that. This person would like to have the guitar ready to roll by Friday. Given that I would need to have the bridge clamped about 24 hours (that puts me at taking the clamps off Thursday morning to early afternoon, I would then really only have Thursday evening or Friday morning to finalize the saddle shaping for proper intonation. So I would be looking at applying string tension to the bridge within 6-12 hours of taking the clamps off.
Is this wise? How much time do you allow a bridge to dry with clamps, and later without clamps, before applying string tension?
Many thanks!
If you have the bridge well fitted, the 30 hours from gluing to string tension is fine.
I vacuum clamp bridges with hot hide and have no need to leave it clamped any longer than 30 minutes
12 hours is enough clamp time, and can be strung up after 24 hours, no problem.
Jim
© 2024 Created by Frank Ford. Powered by