After finishing a peghead I hard a couple of low spots where I had replaced inlay. I drop filled, scraped and polished.I allowed 24 hr for the drop fill to dry. After a week the spots where I drop filled had shrunk, again leaving a low area where I drop filled. How long do I wait to be assured shrinking/drying is done befor final sand and polishing?